Leverlock Auto Toothpick-Part2
Posted: Fri Jun 29, 2012 1:16 am
Blade and backspring cut, shaped and drilled.
Test fit open and closed.
Blade ground and ready for the oven. Bacckspring will be as soon as I cut in the notch for the throw spring.
Steel parts treated and tempered. Throw spring installed and seer assembly made. Ready for a trial run.
Coming right along. Part 3 coming soon.
WB
Test fit open and closed.
Blade ground and ready for the oven. Bacckspring will be as soon as I cut in the notch for the throw spring.
Steel parts treated and tempered. Throw spring installed and seer assembly made. Ready for a trial run.
Coming right along. Part 3 coming soon.
WB